In July of 2012 Nellis Construction was contracted to excavate a drainage channel in Brampton called The Natural Heritage System. A temporary water diversion channel ...
In 2011 the sports fields of this private school were reconstructed. Nellis Construction was hired to provide the rough grading. Dozers with GPS grade control ...
Nellis Construction was awarded the contract for the construction of a large storm water management pond in Milton, Ontario. This pond was designed to service ...
Construction of 6 new soccer fields for the Town of Halton Hills, Ontario began in October 2009. Nellis Construction was retained to perform the earth ...
Construction of the Fairway Road extension began in the fall of 2010. This project will connect Fairway Road in Kitchener to Kossuth Road in Cambridge. ...